Project Details

Our Engineering Specialties Include

General Electric

End User: General Electric Pakistan

Description: 1) Skilled Man Power Supply for Boiler. 2) Fabrication, erection and testing of Fire Fighting Tanks and associated Piping.

Project Location: Dear Murad Jamali Baluchistan Uch Power Plant

Nature of Work: 1) Services. 2) Mech Construction.

Completion Year: 1998

ESB International (Energy Company)

End User: Uch Power Ltd

Description: Maintenance Works of: Gas Turbines.

Project Location: Dear Murad Jamali Baluchistan Uch Power Plant

Nature of Work: Mech Maintenance & Overhauling.

Completion Year: 2002

Petrosin Products Pakistan Ltd

End User: Liberty Tenaga Berhad Malaysia

Description: Fabrication, Erection and Testing of: Diesel Storage Tank.

Project Location: Dharki Sindh Liberty Power Plant

Nature of Work: Mech Construction.

Completion Year: 2002

Frenco

End User: WAPDA

Description: 1) 28" size, Material Carbon Steel, 9.5 Km length. 2) 22", 20", 18", 16" sizes, Material HDPE, total length of 60 Km. All these pipe lines were underground.

Project Location: Kashmore Sind Guddu Thermal Power Plant

Nature of Work: Mech Construction.

Completion Year: 2006

Kaplan Power

End User: Kaplan Power Malaysia

Description: Fuel Tanks for Diesel Generator 20 KVACapacity: 500 Ltr

Project Location: Islamabad

Nature of Work: Fabrication+Supply.

Completion Year: 2020

Siemens

End User: Pak Arab Refinery

Description: Fabrication, Erection, Commissioning of Piping.

Project Location: Muzaffargarh Punjab PARCO Oil Refinery

Nature of Work: Mech Construction.

Completion Year: 2001

Petrosin

End User: Liberty Tenaga Berhad Malaysia

Description: 1) Assembly, Field joints Fabrication, Erection, and Testing of: Equipment, skids Piperack and Piping. 2) Pipeline Fabrication, Erection / Laying, Testing and Commissioning of: 12", Material Carbon Steel, 700mx4 length. Gas metering station, H2S removal (Amin and Sulfa treat), Dehydration Unit Erection, Condensate Handling, Fire Fighting Systems.

Project Location: Qadirpur Sindh Liberty Gas Treatment Plant

Nature of Work: Mech Installation and Construction.

Completion Year: 2001

Pipeline Construction Company PCL

End User: OMV

Description: Pipeline Fabrication, Erection / Laying, Testing and Commissioning.: 10", 8" size, Material Duplex Steel, 30 Kilometers length.

Project Location: Kadanwari Sindh Kadanwari Gas Field

Nature of Work: Mech Construction.

Completion Year: 2003

Pipeline Construction Company PCL

End User: OMV

Description: Pipeline Fabrication, Erection / Laying, Testing and Commissioning of: 20" size, Material Carbon Steel, 14 Kilometers length.

Project Location: Sawan Sind Sawan Gas Field

Nature of Work: Mech Construction.

Completion Year: 2003

Pipeline Construction Company PCL

End User: OMV

Description: Pipeline Fabrication, Erection / Laying, Testing and Commissioning of: 10" size, Material Carbon Steel, 21 Kilometers length.

Project Location: Kadanwari Sindh Kadanwari Gas Field

Nature of Work: Mech Construction.

Completion Year: 2005

Presson Descon Intl Ltd PDIL

End User: Petronas

Description: Erection / Installation of: Assorted Sizes and Schedule of Carbon Steel and Duplex Steel Flow Lines.

Project Location: Mehar Sindh Rehmat Gas Treatment Plant

Nature of Work: Mech Construction.

Completion Year: 2005

Petronas Carigali Pakistan LTD PCPL

End User: Petronas

Description: Mechanical Overhauling Works during Annual Turn Around.

Project Location: Mehar Sindh Rehmat Gas Treatment Plant

Nature of Work: Mech Maintenance & Overhauling.

Completion Year: 2005

Presson Descon Intl Ltd PDIL

End User: MOL Pakistan Oil & Gas Co B.V.

Description: Fabrication and Supply of: 125 Ft height Flare Stack.

Project Location: Kohat KPK Gurguri Gas Treatment Plant

Nature of Work: Supply+Mech Fab.

Completion Year: 2008

Presson Descon Intl Ltd PDIL

End User: MOL

Description: Mechanical Construction Work for: Standby Dehydration Unit.

Project Location: Kohat KPK Gurguri Gas Treatment Plant

Nature of Work: Mech Construction.

Completion Year: 2009

OMV Pakistan

End User: OMV Pakistan Exploration and Production

Description: Fabrication, Erection and Testing of piping works. of: Wartsila Engine upgraded Cooling System.

Project Location: Sawan Sind Sawan Gas Field

Nature of Work: Mech Fab.

Completion Year: 2009

OMV Pakistan

End User: OMV Pakistan Exploration and Production

Description: Re Location of Incinerator and Installation of Flare Stack & Tip.

Project Location: Kadanwari Sindh Kadanwari Gas Field

Nature of Work: Mech Construction.

Completion Year: 2009

MOL Pakistan

End User: MOL Pakistan Oil & Gas Co B.V.

Description: Mechanical Construction Works for: Wellhead Surface Facility.

Project Location: Kohat KPK Mamikhel-1 Wellhead Surface Facilities

Nature of Work: Mech Construction.

Completion Year: 2009

OMV Pakistan

End User: OMV Pakistan Exploration and Production

Description: Laying of: Fire Water Ring at Kadanwari Camp-2.

Project Location: Kadanwari Sindh Kadanwari Gas Field

Nature of Work: Mech Construction.

Completion Year: 2010

OMV Pakistan

End User: OMV Pakistan Exploration and Production

Description: Laying of: Fire Water Ring at Miano FEC Project.

Project Location: Miano Sindh Miano FEC Project.

Nature of Work: Mech Construction.

Completion Year: 2010

PAK GULF

End User: OMV Pakistan Exploration and Production

Description: Fabrication and Supply of: Steel Structure For Level 3 & Level 4.

Project Location: Kadanwari Sindh Kadanwari Gas Field

Nature of Work: Supply

Completion Year: 2011

OMV Pakistan

End User: OMV Pakistan Exploration and Production

Description: Fabrication and Erection of: Piping for Potable Water Line At Kadanwari Camp-2.

Project Location: Kadanwari Sindh Kadanwari Gas Field

Nature of Work: Mech Construction.

Completion Year: 2011

OMV Pakistan

End User: OMV Pakistan Exploration and Production

Description: Installation of: Isolation & By-Pass Valves.

Project Location: Sawan Sind Sawan Gas Field

Nature of Work: Mech Construction.

Completion Year: 2011

OMV Pakistan

End User: OMV Pakistan Exploration and Production

Description: Installation & Commissioning of: Corrosion Inhibitor Skid.

Project Location: Sawan Sind Sawan Gas Field

Nature of Work: Mech Construction.

Completion Year: 2011

OMV Pakistan

End User: OMV Pakistan Exploration and Production

Description: Erection of: Piping at Miano 8.

Project Location: Miano Sindh Miano FEC Project.

Nature of Work: Mech Construction.

Completion Year: 2011

OMV Pakistan

End User: OMV Pakistan Exploration and Production

Description: Piping Works for: Loading Arm.

Project Location: Sawan Sind Sawan Gas Field

Nature of Work: Mech Construction.

Completion Year: 2012

OMV Pakistan

End User: OMV Pakistan Exploration and Production

Description: Supply & Installation of: Guy Mast Tower.

Project Location: Kadanwari Sindh Kadanwari Gas Field

Nature of Work: Mech Construction.

Completion Year: 2012

OMV Pakistan

End User: OMV Pakistan Exploration and Production

Description: Mechanical Works during 2012 Annual Turn Around.

Project Location: Kadanwari Sindh Kadanwari Gas Field

Nature of Work: Mech Construction.

Completion Year: 2012

OMV Pakistan

End User: OMV Pakistan Exploration and Production

Description: Field Development Works including Equipment Installation, Pipe Line, Piping, and Structure Works for: Gas Treatment Plants.

Project Location: Miano Sindh Miano FEC Project.

Nature of Work: Mech Construction.

Completion Year: 2013

Presson Descon Intl Ltd PDIL

End User: Pakistan Petroleum Ltd.

Description: Supply and Fabrication of: Flare Stack for Adhi - 3

Project Location: Adhi Sindh Adhi Gas Field

Nature of Work: Supply+Mech Fab.

Completion Year: 2014

PSS Asia

End User: Polish Oil & Gas Company Pakistan

Description: Field Development Works including Equipment Installation, Pipe Line, Piping, and Structure.

Project Location: Daddu Sind Rehman Production Facility

Nature of Work: Mech Construction.

Completion Year: 2015

OMV Pakistan

End User: OMV Pakistan Exploration and Production

Description: Installation of wellhead Compressors 03 Nos

Project Location: Kadanwari Sindh Kadanwari Gas Field

Nature of Work: Mech Construction.

Completion Year: 2015

OMV Pakistan

End User: OMV Pakistan Exploration and Production

Description: Installation of wellhead Compressors 01 Nos

Project Location: Sawan Sind Sawan Gas Field

Nature of Work: Mech Construction.

Completion Year: 2015

Quality One Petroleum Pvt Ltd.

End User: Quality One Petroleum Pvt Ltd.

Description: Construction of Oil Depot.

Project Location: Sahiwal Punjab Sahiwal Bonga Hayat Road Oil Depot

Nature of Work: Mech Construction.

Completion Year: 2016

Outreach Pvt. Limited

End User: Outreach Pvt. Limited

Description: Supply of Oil Storage Tanks.

Project Location: Manga Punjab Manga Oil Depot.

Nature of Work: Mech Construction.

Completion Year: 2016

Descon Engineering Limited

End User: Pak Arab Refinery

Description: Civil, Piping, Painting and Equipment Installation and E & I Works.

Project Location: Bobbat Sind Bobbat Oil Field

Nature of Work: CME Construction.

Completion Year: 2019

Oil Industries Pvt Limited

End User: Oil Industries Pakistan Pvt Ltd.(OIPL)

Description: Construction / Erection of Petroleum Storage Depot.

Project Location: Sahiwal Punjab

Nature of Work: CME Construction.

Completion Year: 2019

Hi-Tech Lubricants Limited

End User: Hi-Tech Lubricants Limited

Description: 1) Construction of: Tanks, Foundation & Gantry (Contract-II). 2) Supply & Installation of: Piping & Supports (Contract-IV). 3) Miscellaneous Civil Works (Contract-III).

Project Location: Nowshera KPK Nowshera Oil Depot

Nature of Work: Supply+CME Construction.

Completion Year: 2020

Petroleum Exploration Pvt Ltd.PEPL

End User: Petroleum Exploration Pvt Ltd.PEPL

Description: Supply of: High Pressure Scrubber Material at Amine Plant.

Project Location: Jamshoro Sind Ayesha Gas Complex

Nature of Work: Supply.

Completion Year: 2020

Hi-Tech Lubricants Limited

End User: Hi-Tech Lubricants Limited

Description: Fabrication and Erection of Bulk storage tanks and associated piping for: SKO Tanks, PMG Tanks

Project Location: Sundar Punjab Oil Depot

Nature of Work: CME Construction.

Completion Year: 2021

Hi-Tech Lubricants Limited

End User: Hi-Tech Lubricants Limited

Description: Manufacturing & Supply of: U/G Storage Tanks of various sizes at HTL Retail Stations.

Project Location: Punjab & KPK regions

Nature of Work: Fabrication

Completion Year: 2022

Hi-Tech Lubricants Limited

End User: Hi-Tech Lubricants Limited

Description: Manufacturing & Supply of: U/G Storage Tanks of various sizes at HTL Retail Stations.

Project Location: Punjab & KPK regions

Nature of Work: Fabrication

Completion Year: 2023

Hi-Tech Lubricants Limited

End User: Hi-Tech Lubricants Limited

Description: Piping Materials to Remodel Decanting Headers, Materials for Foam Sprinkler System in Gantry at HTL Depot Nowshera

Project Location: HTL Nowshera, KPK Oil Depot

Nature of Work: Civil Construction.

Completion Year: 2023

Hi-Tech Lubricants Limited

End User: Hi-Tech Lubricants Limited

Description: Services for Repairing of PMG Tanks, Fall Arrestor System in Gantry at HTL Sahiwal Oil Depot

Project Location: HTL Sahiwal Oil Depot

Nature of Work: Civil Construction.

Completion Year: 2023

MOL Pakistan

End User: MOL Pakistan

Description: WHSF DISMANTLING, CIVIL WORKS FOR WELL LOCATION CONSTRUCTION & WHSF RE-INSTALLATION FOR MAKORI EAST-5 SIDE-TRACK (CONTRACT REFERENCE NUMBER: CON1189)

Project Location: Makori East-5, KPK

Nature of Work: Civil Construction.

Completion Year: 2023

MEINHARDT EPCM PAKISTAN (SHELL PAKISTAN)

End User: MEINHARDT EPCM PAKISTAN (SHELL PAKISTAN)

Description: Civil Works for Construction of Sawan Filling Station NTI DHA Phase-2 Islamabad

Project Location: Sawan Filling Station NTI DHA Phase-2 Islamabad

Nature of Work: Civil Construction.

Completion Year: 2023

MEINHARDT EPCM PAKISTAN (SHELL PAKISTAN)

End User: MEINHARDT EPCM PAKISTAN (SHELL PAKISTAN)

Description: Supply, Transportation & Installation of Car Wash Lift and Equipments at Sawan Filling Station NTI DHA Phase 2 Islamabad

Project Location: Sawan Filling Station NTI DHA Phase-2 Islamabad

Nature of Work: Civil Construction.

Completion Year: 2023

MEINHARDT EPCM PAKISTAN (SHELL PAKISTAN)

End User: MEINHARDT EPCM PAKISTAN (SHELL PAKISTAN)

Description: Supply & Installation of Water Recycling Plant at Sawan Filling Station NTI DHA Phase-2 Islamabad

Project Location: Sawan Filling Station NTI DHA Phase-2 Islamabad

Nature of Work: Civil Construction.

Completion Year: 2023

MEINHARDT EPCM PAKISTAN (SHELL PAKISTAN)

End User: MEINHARDT EPCM PAKISTAN (SHELL PAKISTAN)

Description: Site Construction of SPL NTI-20 Ferozepur Road, Lahore

Project Location: Filling Station NTI 20 Ferozepur Road Lahore

Nature of Work: Civil Construction.

Completion Year: 2023

MEINHARDT EPCM PAKISTAN (SHELL PAKISTAN)

End User: MEINHARDT EPCM PAKISTAN (SHELL PAKISTAN)

Description: Supply & Installation of Water Recycling Plant at NTI 20 Ferozepur Road Lahore

Project Location: Filling Station NTI 20 Ferozepur Road Lahore

Nature of Work: Civil Construction.

Completion Year: 2023

MEINHARDT EPCM PAKISTAN (SHELL PAKISTAN)

End User: MEINHARDT EPCM PAKISTAN (SHELL PAKISTAN)

Description: Civil and Plumbing Works - KDR Project at IDEAL FILLING STATION-10041048 Sargodha

Project Location: Ideal Filling Station, Sargodha

Nature of Work: Civil Construction.

Completion Year: 2023

MEINHARDT EPCM PAKISTAN (SHELL PAKISTAN)

End User: MEINHARDT EPCM PAKISTAN (SHELL PAKISTAN)

Description: Civil & Plumbing Works for Site Construction at NTI Canal Pull Lahore

Project Location: Filling Station, NTI Canal Pull Lahore

Nature of Work: Civil Construction.

Completion Year: 2023

Hi-Tech Lubricants Limited

End User: Hi-Tech Lubricants Limited

Description: Construction of New Room at 2-K Lahore

Project Location: HTL Retail Station Construction at 2-K Gulberg, Lahore, Punjab

Nature of Work: Civil Construction.

Completion Year: 2024

Hi-Tech Lubricants Limited

End User: Hi-Tech Lubricants Limited

Description: Construction of Tank Pits & Fuel Down Fitting at 2-K Lahore

Project Location: HTL Retail Station Construction at 2-K Gulberg, Lahore, Punjab

Nature of Work: Civil Construction.

Completion Year: 2024

Hi-Tech Lubricants Limited

End User: Hi-Tech Lubricants Limited

Description: Construction of Steel Structure Canopy & Monopole 2-K Lahore

Project Location: HTL Retail Station Construction at 2-K Gulberg, Lahore, Punjab

Nature of Work: Civil Construction.

Completion Year: 2024

Hi-Tech Lubricants Limited

End User: Hi-Tech Lubricants Limited

Description: Construction Works: PRE-EXTENSION WORK HTL DEPOT AT NOWSHERA, KPK

Project Location: HTL Nowshera, KPK Oil Depot

Nature of Work: Civil Construction.

Completion Year: 2024

Hi-Tech Lubricants Limited

End User: Hi-Tech Lubricants Limited

Description: Civil Works (Buildings, Cut off Drain, Drive way) HTL Lahore Retail Station 2-K

Project Location: HTL Retail Station Construction at 2-K Gulberg, Lahore, Punjab

Nature of Work: Civil Construction.

Completion Year: 2024

AFCCO OIL AND GAS FIELD SERVICES (SMC) PVT LTD.

End User: AFCCO OIL AND GAS FIELD SERVICES (SMC) PVT LTD.

Description: Construction of Drilling Yard Shed, Chemical Shed and Car Parking Shed

Project Location: Dadu, Sindh

Nature of Work: Civil Construction.

Completion Year: 2024

AFCCO OIL AND GAS FIELD SERVICES (SMC) PVT LTD.

End User: AFCCO OIL AND GAS FIELD SERVICES (SMC) PVT LTD.

Description: Design, Supply and Installation of Structural Steel Works for Drilling Yard Shed, Chemical Shed and Car Parking Shed

Project Location: Dadu, Sindh

Nature of Work: Civil Construction.

Completion Year: 2024

MOL Pakistan

End User: MOL Pakistan

Description: Decommissioning Cost Estimation for Processing and Compression Facilities

Project Location: KPK

Nature of Work: Civil Construction.

Completion Year: 2024

Hi-Tech Blending Pvt Limited

End User: Hi-Tech Blending Pvt Limited

Description: PIPING WORKS (PHASE - 1 PIPING FOR ADDITIVE TRANSFER)

Project Location: HTL Blending Plant Sundar Lahore, Punjab

Nature of Work: Civil Construction.

Completion Year: 2024

MOL Pakistan

End User: MOL Pakistan

Description: Critical civil works for Makori East Secondary Compression project

Project Location: Kohat, KPK

Nature of Work: Civil Construction.

Completion Year: 2024

MOL Pakistan

End User: MOL Pakistan

Description: Services required for Installation of Kirby Shed for Maramzai Compression

Project Location: KPK

Nature of Work: Civil & Mechanical Construction

Completion Year: Ongoing

MOL Pakistan

End User: MOL Pakistan

Description: Construction Work for Razgir-01 WH and VA at Tolanj West-02

Project Location: Kohat, KPK

Nature of Work: Civil & Mechanical Construction

Completion Year: Ongoing

MOL Pakistan

End User: MOL Pakistan

Description: Relocation of Condensate Storage Tank from Gurguri Plant

Project Location: Kohat, KPK

Nature of Work: Civil & Mechanical Construction

Completion Year: Ongoing

Hi-Tech Blending Pvt Limited

End User: Hi-Tech Blending Pvt Limited

Description: Phase - II Blending Kettles Piping Revamping For Additive Transfer

Project Location: HTL Blending Plant Sundar Lahore, Punjab

Nature of Work: Civil & Mechanical Construction

Completion Year: Ongoing

Hi-Tech Blending Pvt Limited

End User: Hi-Tech Blending Pvt Limited

Description: Phase - IV Modification Of Base Oil Decantation & Transfer Piping Works

Project Location: HTL Blending Plant Sundar Lahore, Punjab

Nature of Work: Civil & Mechanical Construction

Completion Year: Ongoing

Hi-Tech Blending Pvt Limited

End User: Hi-Tech Blending Pvt Limited

Description: Capacity Enhancement Of Additive Storage Tanks And Blending Kettles

Project Location: HTL Blending Plant Sundar Lahore, Punjab

Nature of Work: Civil & Mechanical Construction

Completion Year: Ongoing

Hi-Tech Blending Pvt Limited

End User: Hi-Tech Blending Pvt Limited

Description: Capacity Enhancement Of Additive Storage Tanks And Blending Kettles Piping Works

Project Location: HTL Blending Plant Sundar Lahore, Punjab

Nature of Work: Civil & Mechanical Construction

Completion Year: Ongoing

M/s Shazia Siddiq

End User: Siddique Trade Center

Description: Installation of 03 Chillers and their associated piping and ducting.

Project Location: Lahore Siddique Trade Center

Nature of Work: Mech Construction.

Completion Year: 2004

BNP (Pvt) Limited

End User: Hayat Hotels.

Description: Installation of: Bridge at Floor - 21 in Grand Hayat Hotel.

Project Location: Islamabad Grand Hayat Hotel

Nature of Work: Civil+Mechanical Construction

Completion Year: 2015

Target Consulting Services Pvt Limited

End User: Pakistan Navy

Description: Supply of: Ballast K500L Blocks 12 Nos.

Project Location: Karachi

Nature of Work: Supply.

Completion Year: 2022

Descon Oxy Chem

End User: Descon Oxy Chem

Description: Fabrication and Erection of: Steel Structure for Various Buildings including Pipe Rack.

Project Location: Sheikhpura Punjab Descon Oxy Chem

Nature of Work: Mech Construction.

Completion Year: 2008

ICI Pakistan

End User: ICI Pakistan.

Description: Installation of: Coal Fired Boiler in Khewra Plant.

Project Location: Khewra Punjab ICI Pakistan Soda Ash Plant

Nature of Work: Mech Construction.

Completion Year: 2013

Best Way Cement Ltd.

End User: Best Way Cement Ltd.

Description: Installation of: Coal Fired Boilers (Qty 02).

Project Location: Kallar Kahar Punjab Best Way Cement Factory

Nature of Work: Mech Construction.

Completion Year: 2013

Hi-Tech Blending Pvt Limited

End User: Hi-Tech Blending Pvt Limited

Description: Construction of: Oil Depot

Project Location: Sahiwal Punjab

Nature of Work: Supply+CME Construction.

Completion Year: 2016

ICI Khewra

End User: ICI Pakistan

Description: Sandblasting & Painting of: Steel Structure.

Project Location: Khewra Punjab ICI Pakistan Soda Ash Plant

Nature of Work: Mech Construction.

Completion Year: 2017

Hi-Tech Lubricants Limited

End User: Hi-Tech Lubricants Limited

Description: Construction of: Oil Depot at Arifwala Road Sahiwal.

Project Location: Sahiwal Punjab Arifwala Road Sahiwal, Oil Depot

Nature of Work: CME Construction.

Completion Year: 2019

FLOW Petroleum

End User: FLOW Petroleum

Description: Construction of: Oil Bulk Depot at Attock.

Project Location: Attock KPK Attock Oil Depot

Nature of Work: CME Construction.

Completion Year: 2019

Eitmaad Engineering Pvt Limited

End User: Spring Supports Fabrication

Description:

Project Location:

Nature of Work: Fabrication.

Completion Year: 2020

Eitmaad Engineering Pvt Limited

End User:

Description: Supply of Galvanized Rungs

Project Location:

Nature of Work: Supply.

Completion Year: 2020

Eitmaad Engineering Pvt Limited

End User: Oil & Gas Development Corporation Limited

Description: Supply of Stair Treads and Grating.

Project Location: KPK NASHPA

Nature of Work: Supply.

Completion Year: 2020

Alternative Chemicals Pvt Limited

End User: Alternative Chemicals Pvt Limited

Description: Construction of: Tank Foundation.

Project Location: Sundar Punjab

Nature of Work: Civil Construction.

Completion Year: 2021

Nimir Chemicals Pvt Limited

End User: Nimir Chemicals Pvt Limited

Description: Fabrication and erection of: Orth xylene Storage Tank.

Project Location: Sheikhupura Punjab Nimir Chemical Complex

Nature of Work: Mech Construction.

Completion Year: 2021

Eitmaad Engineering Pvt Limited

End User: Naveena steel Mills

Description: Supply of: Cable Trays.

Project Location: Karachi Sind Naveena steel Mills

Nature of Work: Supply.

Completion Year: 2021

Hi-Tech Blending Pvt Limited

End User: Hi-Tech Blending Pvt Limited

Description: Construction Works: Utility Building for New EBM Section at HTBL Plant

Project Location: HTL Blending Plant Sundar Lahore, Punjab

Nature of Work: CME Construction.

Completion Year: 2022

Hi-Tech Blending Pvt Limited

End User: Hi-Tech Blending Pvt Limited

Description: Construction Works: Extension of Warehouse-2 Building.

Project Location: HTL Blending Plant Sundar Lahore, Punjab

Nature of Work: CME Construction.

Completion Year: 2022

Hi-Tech Blending Pvt Limited

End User: Hi-Tech Blending Pvt Limited

Description: (Additional Construction Works of Warehouse Extension) Construction of Rainwater Reservoir Well

Project Location: HTL Blending Plant Sundar Lahore, Punjab

Nature of Work: Civil Construction.

Completion Year: 2022

Hi-Tech Blending Pvt Limited

End User: Hi-Tech Blending Pvt Limited

Description: Construction of Wall Partition for EBM Section-2 at HTBL Blending Plant

Project Location: HTL Blending Plant Sundar Lahore, Punjab

Nature of Work: Civil Construction.

Completion Year: 2022

Hi-Tech Blending Pvt Limited

End User: Hi-Tech Blending Pvt Limited

Description: Construction of Wall Partition for Filling Hall Workshop & Store Room at HTBL Blending Plant

Project Location: HTL Blending Plant Sundar Lahore, Punjab

Nature of Work: Civil Construction.

Completion Year: 2022

Hi-Tech Blending Pvt Limited

End User: Hi-Tech Blending Pvt Limited

Description: Supply & Installation of Pipeline Fittings & Support of Air Vessel 5000L and HSD Tank 10000 L

Project Location: HTL Blending Plant Sundar Lahore, Punjab

Nature of Work: Civil Construction.

Completion Year: 2022

Hi-Tech Blending Pvt Limited

End User: Hi-Tech Blending Pvt Limited

Description: Supply & Installation of Air Vessel 5000 Litres & Light Poles

Project Location: HTL Blending Plant Sundar Lahore, Punjab

Nature of Work: Civil Construction.

Completion Year: 2022

Hi-Tech Blending Pvt Limited

End User: Hi-Tech Blending Pvt Limited

Description: Existing Warehouse # 1 Building - Additional Work

Project Location: HTL Blending Plant Sundar Lahore, Punjab

Nature of Work: Civil Construction.

Completion Year: 2022

Hi-Tech Blending Pvt Limited

End User: Hi-Tech Blending Pvt Limited

Description: Supply & Installation of Air Vessel 5000 Litres - EBM Department

Project Location: HTL Blending Plant Sundar Lahore, Punjab

Nature of Work: Civil Construction.

Completion Year: 2022

Hi-Tech Blending Pvt Limited

End User: Hi-Tech Blending Pvt Limited

Description: Civil, Mechanical, Sandblasting & Painting Works of EOT Crane 10 Ton capacity

Project Location: HTL Blending Plant Sundar Lahore, Punjab

Nature of Work: Civil Construction. Mech Works

Completion Year: 2022

Hi-Tech Blending Pvt Limited

End User: Hi-Tech Blending Pvt Limited

Description: (Additional Construction Works of Warehouse Extension) Construction of Laboratory, Crusher Room, Office Rooms & Worker Change Rooms at HTBL Plant

Project Location: HTL Blending Plant Sundar Lahore, Punjab

Nature of Work: Civil Construction.

Completion Year: 2022

Hi-Tech Blending Pvt Limited

End User: Hi-Tech Blending Pvt Limited

Description: Construction of Wall Partition for Custom Bounded Warehouse at HTBL Blending Plant

Project Location: HTL Blending Plant Sundar Lahore, Punjab

Nature of Work: Civil Construction.

Completion Year: 2023

Hi-Tech Blending Pvt Limited

End User: Hi-Tech Blending Pvt Limited

Description: Construction of Wall Partition for EBM-II Workshop at HTBL Blending Plant

Project Location: HTL Blending Plant Sundar Lahore, Punjab

Nature of Work: Civil Construction.

Completion Year: 2023

Hi-Tech Blending Pvt Limited

End User: Hi-Tech Blending Pvt Limited

Description: Construction of Road & Filling Remaining Pond Area (Location-Mosque to Farmhouse Front Side Road & Pond Area) at HTBL Sundar Blending Plant

Project Location: HTL Blending Plant Sundar Lahore, Punjab

Nature of Work: Civil Construction.

Completion Year: 2023

Hi-Tech Blending Pvt Limited

End User: Hi-Tech Blending Pvt Limited

Description: (Additional Construction Works of Warehouse Extension) Construction of HTBL Boundary Wall, Road & Drain and additional wall Part-5

Project Location: HTL Blending Plant Sundar Lahore, Punjab

Nature of Work: Civil Construction.

Completion Year: 2023

Hi-Tech Blending Pvt Limited

End User: Hi-Tech Blending Pvt Limited

Description: Supply & Installation Services of Compressor Room Piping at HTL Blending Plant Sundar Lahore

Project Location: HTL Blending Plant Sundar Lahore, Punjab

Nature of Work: Civil Construction.

Completion Year: 2023

Hi-Tech Blending Pvt Limited

End User: Hi-Tech Blending Pvt Limited

Description: Construction of Staff Office & Meeting Room at EBM-II Electrical Work

Project Location: HTL Blending Plant Sundar Lahore, Punjab

Nature of Work: Civil Construction.

Completion Year: 2024

Hi-Tech Blending Pvt Limited

End User: Hi-Tech Blending Pvt Limited

Description: Construction of Staff Office at EBM-II at HTL Blending Plant Sundar Lahore

Project Location: HTL Blending Plant Sundar Lahore, Punjab

Nature of Work: Civil Construction.

Completion Year: 2024

Hi-Tech Blending Pvt Limited

End User: Hi-Tech Blending Pvt Limited

Description: Modification Works for Compressor Room in EBM Unit-1 at HTL Blending Plant Sundar Lahore

Project Location: HTL Blending Plant Sundar Lahore, Punjab

Nature of Work: Civil Construction.

Completion Year: Ongoing

Engro Foods Limited

End User: Engro Corporation

Description: Construction Works of Feed Through, Water Through, Cow Calf Shades, Cow Shades.

Project Location: Chundki Sind EFL Nara Plant Capacity 400 GPM

Nature of Work: Civil Construction.

Completion Year: 2009

Engro Foods Limited

End User: Engro Corporation

Description: Absorption Chiller Room.

Project Location: Chundki Sind EFL Nara Plant Capacity 400 GPM

Nature of Work: Civil Construction.

Completion Year: 2009

Engro Foods Limited

End User: Engro Corporation

Description: Mechanical Construction of: Sprinkler System

Project Location: Chundki Sind EFL Nara Plant Capacity 400 GPM

Nature of Work: Mech Construction.

Completion Year: 2010

Engro Foods Limited

End User: Engro Corporation

Description: Design & Construction Works for: Primary Waste Water Treatment Project.

Project Location: Chundki Sind EFL Nara Plant Capacity 400 GPM

Nature of Work: EPCC.

Completion Year: 2010

Engro Foods Limited

End User: OMV Pakistan Exploration and Production

Description: Drainage Works for: New Tetra pack Hall using Stainless Steel Pipes.

Project Location: Sahiwal Punjab

Nature of Work: Mech Construction.

Completion Year: 2012

Punjab Agriculture & Meat Company

End User: Government of Punjab.

Description: 1) Piping Works ( Hot, Steam & Air). 2) Supply, Fabrication & Installation of Steel Structure for Animal Waiting Saloon. 3) Fabrication, erection and Testing of Fuel Storage Tanks and Water Reservoir Tanks.

Project Location: Lahore, Punjab Municipality Slaughter House

Nature of Work: Mech Construction.

Completion Year: 2012

Haut Buys Pvt Limited

End User: Haut Buys

Description: Construction of: Milking Parlour.

Project Location: Qasoor Punjab Haut Buys Foods

Nature of Work: Civil Construction.

Completion Year: 2022

Red Star

End User: Hewadawal

Description: Design, Supply and Installation of: Jet Fuel Oil Storage Tanks.

Project Location: Afghanistan Kabul Air Port Fuel Storage Facility

Nature of Work: Design+Mech Fab

Completion Year: 2009

Hewadawal

End User: US Army

Description: Design, Supply and Installation of: Waste Water Treatment Plant.

Project Location: Afghanistan Kabul Air Port Fuel Storage Facility

Nature of Work: EPCC.

Completion Year: 2009

Bismallah Textiles Ltd

End User: OMV Pakistan Exploration and Production

Description: Supply and Installation of: Coal Fired Boiler and Oil Heater.

Project Location: Faisalabad Punjab Bismallah Textiles Ltd

Nature of Work: Supply+Mech Construction.

Completion Year: 2012

Warid & Wincom

End User: Warid & Wincom

Description: Mechanical Fabrication & Erection of: Mobile Phone Towers.

Project Location: Multiple Locations Various Regions Nationwide

Nature of Work: Supply+Mech Fab.

Completion Year: 2009

JAZZ Pakistan

End User: JAZZ Pakistan

Description: Supply and CME Works & SAQ Works for: B2S Tower.

Project Location: Multiple Locations Various Regions Nationwide

Nature of Work: Supply+CME Construction.

Completion Year: 2017

MEP Solution Pvt Limited

End User: MEP Solution Pvt Limited

Description: Supply of Handholes Type 1 (900mm x 900mm x 900mm)

Project Location: Lahore

Nature of Work: Supply.

Completion Year: 2018

JAZZ Pakistan

End User: JAZZ Pakistan

Description: Supply and CME Works & SAQ Works for: B2S Tower.

Project Location: Multiple Locations Various Regions Nationwide

Nature of Work: Supply+CME Construction.

Completion Year: 2018

EdotCo Towers Pakistan Pvt Limited

End User: Telenor, Mobilink, Zong & Ufone

Description: Manufacturing, Supply, CME Works & SAQ Works for: B2S Telecom Towers and Sites Buildouts

Project Location: Multiple Locations Various Regions Nationwide

Nature of Work: Supply+CME Construction.

Completion Year: 2018

EdotCo Towers Pakistan Pvt Limited

End User: Telenor, Mobilink, Zong & Ufone

Description: Manufacturing, Supply, CME Works & SAQ Works for: B2S Telecom Towers and Sites Buildouts

Project Location: Multiple Locations Various Regions Nationwide

Nature of Work: Supply+CME Construction.

Completion Year: 2019

JAZZ Pakistan

End User: JAZZ Pakistan

Description: Supply and CME Works & SAQ Works for: B2S Tower.

Project Location: Multiple Locations Various Regions Nationwide

Nature of Work: Supply+CME Construction.

Completion Year: 2019

Engro Enfrashare Pvt Limited

End User: Telenor, Mobilink, Zong & Ufone

Description: Manufacturing, Supply, CME Works & SAQ Works for: B2S Telecom Towers and Sites Buildouts

Project Location: Multiple Locations Various Regions Nationwide

Nature of Work: Supply+CME Construction.

Completion Year: 2019

EdotCo Towers Pakistan Pvt Limited

End User: Telenor, Mobilink, Zong & Ufone

Description: Manufacturing, Supply, CME Works & SAQ Works for: B2S Telecom Towers and Sites Buildouts

Project Location: Multiple Locations Various Regions Nationwide

Nature of Work: Supply+CME Construction.

Completion Year: 2020

JAZZ Pakistan

End User: JAZZ Pakistan

Description: Supply and CME Works & SAQ Works for: B2S Tower.

Project Location: Multiple Locations Various Regions Nationwide

Nature of Work: Supply+CME Construction.

Completion Year: 2020

Engro Enfrashare Pvt Limited

End User: Telenor, Mobilink, Zong & Ufone

Description: Manufacturing, Supply, CME Works & SAQ Works for: B2S Telecom Towers and Sites Buildouts

Project Location: Multiple Locations Various Regions Nationwide

Nature of Work: Supply+CME Construction.

Completion Year: 2020

EdotCo Towers Pakistan Pvt Limited

End User: Telenor, Mobilink, Zong & Ufone

Description: Manufacturing, Supply, CME Works & SAQ Works for: B2S Telecom Towers and Sites Buildouts

Project Location: Multiple Locations Various Regions Nationwide

Nature of Work: Supply+CME Construction.

Completion Year: 2021

JAZZ Pakistan

End User: JAZZ Pakistan

Description: Supply and CME Works & SAQ Works for: B2S Tower.

Project Location: Multiple Locations Various Regions Nationwide

Nature of Work: Supply+CME Construction.

Completion Year: 2021

Engro Enfrashare Pvt Limited

End User: Telenor, Mobilink, Zong & Ufone

Description: Manufacturing, Supply, CME Works & SAQ Works for: B2S Telecom Towers and Sites Buildouts

Project Location: Multiple Locations Various Regions Nationwide

Nature of Work: Supply+CME Construction.

Completion Year: 2021

Al-Wasal Traders & Consultants

End User: STC and Zain

Description: Monopole Supply for Bahrain Project

Project Location: Multiple Locations Various Regions Nationwide

Nature of Work: Supply.

Completion Year: 2022

Communicator's Globe Pvt Limited

End User: SEC

Description: Supply of: Tubular Pole 07 Meter.

Project Location: Gilgit and Azad Kashmir

Nature of Work: Supply.

Completion Year: 2022

EdotCo Towers Pakistan Pvt Limited

End User: Telenor, Mobilink, Zong & Ufone

Description: Manufacturing, Supply, CME Works & SAQ Works for: B2S Telecom Towers and Sites Buildouts

Project Location: Multiple Locations Various Regions Nationwide

Nature of Work: Supply+CME Construction.

Completion Year: 2022

JAZZ Pakistan

End User: JAZZ Pakistan

Description: Supply and CME Works & SAQ Works for: B2S Tower.

Project Location: Multiple Locations Various Regions Nationwide

Nature of Work: Supply+CME Construction.

Completion Year: 2022

Engro Enfrashare Pvt Limited

End User: Telenor, Mobilink, Zong & Ufone

Description: Manufacturing, Supply, CME Works & SAQ Works for: B2S Telecom Towers and Sites Buildouts

Project Location: Multiple Locations Various Regions Nationwide

Nature of Work: Supply+CME Construction.

Completion Year: 2022

EdotCo Towers Pakistan Pvt Limited

End User: Telenor, Mobilink, Zong & Ufone

Description: Manufacturing, Supply, CME Works & SAQ Works for: B2S Telecom Towers and Sites Buildouts

Project Location: Multiple Locations Various Regions Nationwide

Nature of Work: Supply+CME Construction.

Completion Year: 2023

JAZZ Pakistan

End User: JAZZ Pakistan

Description: Supply and CME Works & SAQ Works for: B2S Tower.

Project Location: Multiple Locations Various Regions Nationwide

Nature of Work: Supply+CME Construction.

Completion Year: 2023

Engro Enfrashare Pvt Limited

End User: Telenor, Mobilink, Zong & Ufone

Description: Manufacturing, Supply, CME Works & SAQ Works for: B2S Telecom Towers and Sites Buildouts

Project Location: Multiple Locations Various Regions Nationwide

Nature of Work: Supply+CME Construction.

Completion Year: 2023

TAWAL Pakistan

End User: Telenor, Mobilink, Zong & Ufone

Description: Manufacturing, Supply, & CME Works for: B2S Telecom Towers and Sites Buildouts

Project Location: Multiple Locations Various Regions Nationwide

Nature of Work: Supply+CME Construction.

Completion Year: 2023

Huawei Technologies Pakistan Pvt Limited

End User: Telenor, Mobilink, Zong & Ufone

Description: Manufacturing & Supply of Telecom Towers, accessories and Buildouts.

Project Location: Multiple Locations Various Regions Nationwide

Nature of Work: Supply.

Completion Year: 2023

Huawei Technologies Pakistan Pvt Limited

End User: Telenor, Mobilink, Zong & Ufone

Description: Manufacturing & Supply of Telecom Towers, accessories and Buildouts.

Project Location: Multiple Locations Various Regions Nationwide

Nature of Work: Supply.

Completion Year: Ongoing

Huawei Technologies Pakistan Pvt Limited

End User: Telenor, Mobilink, Zong & Ufone

Description: Engineering Services (Civil Works & Telecom Equipment related Scope)

Project Location: Multiple Locations Various Regions Nationwide

Nature of Work: Civil Works & Telecom Equipment

Completion Year: Ongoing

JAZZ Pakistan

End User: JAZZ Pakistan

Description: Supply and CME Works & SAQ Works for: B2S Tower.

Project Location: Multiple Locations Various Regions Nationwide

Nature of Work: Supply+CME Construction.

Completion Year: Ongoing

Engro Enfrashare Pvt Limited

End User: Telenor, Mobilink, Zong & Ufone

Description: Manufacturing, Supply, CME Works & SAQ Works for: B2S Telecom Towers and Sites Buildouts

Project Location: Multiple Locations Various Regions Nationwide

Nature of Work: Supply+CME Construction.

Completion Year: Ongoing

EdotCo Towers Pakistan Pvt Limited

End User: Telenor, Mobilink, Zong & Ufone

Description: Manufacturing, Supply, CME Works & SAQ Works for: B2S Telecom Towers and Sites Buildouts

Project Location: Multiple Locations Various Regions Nationwide

Nature of Work: Supply+CME Construction.

Completion Year: Ongoing

TAWAL Pakistan

End User: Telenor, Mobilink, Zong & Ufone

Description: Manufacturing, Supply, & CME Works for: B2S Telecom Towers and Sites Buildouts

Project Location: Multiple Locations Various Regions Nationwide

Nature of Work: Supply+CME Construction.

Completion Year: Ongoing

Best Way Cement Ltd.

End User: Best Way Cement Ltd.

Description: Installation of: Coal Fired Boilers (Qty 02).

Project Location: Kallar Kahar Punjab Best Way Cement Factory

Nature of Work: Mech Construction.

Completion Year: 2013

Airmed Pvt Limited

End User: Airmed

Description: Supply & Installation of: PEB Shed at Plot 284.

Project Location: Bhalwal Punjab

Nature of Work: Supply+CME Construction.

Completion Year: 2021

Miltech Pvt Limited

End User: Miltech

Description: Supply & Installation of: Counterpoise Cable.

Project Location: Islamabad IBD Air Base Airport

Nature of Work: Supply+E Construction.

Completion Year: 2021

Airmed Pvt Limited

End User: Airmed

Description: Construction Works at: Plot 284, Bhalwal Industrial Estate.

Project Location: Bhalwal Punjab

Nature of Work: Civil Construction.

Completion Year: 2022