End User: General Electric Pakistan
Description: 1) Skilled Man Power Supply for Boiler. 2) Fabrication, erection and testing of Fire Fighting Tanks and associated Piping.
Project Location: Dear Murad Jamali Baluchistan Uch Power Plant
Nature of Work: 1) Services. 2) Mech Construction.
Completion Year: 1998
End User: Uch Power Ltd
Description: Maintenance Works of: Gas Turbines.
Project Location: Dear Murad Jamali Baluchistan Uch Power Plant
Nature of Work: Mech Maintenance & Overhauling.
Completion Year: 2002
End User: Liberty Tenaga Berhad Malaysia
Description: Fabrication, Erection and Testing of: Diesel Storage Tank.
Project Location: Dharki Sindh Liberty Power Plant
Nature of Work: Mech Construction.
Completion Year: 2002
End User: WAPDA
Description: 1) 28" size, Material Carbon Steel, 9.5 Km length. 2) 22", 20", 18", 16" sizes, Material HDPE, total length of 60 Km. All these pipe lines were underground.
Project Location: Kashmore Sind Guddu Thermal Power Plant
Nature of Work: Mech Construction.
Completion Year: 2006
End User: Kaplan Power Malaysia
Description: Fuel Tanks for Diesel Generator 20 KVACapacity: 500 Ltr
Project Location: Islamabad
Nature of Work: Fabrication+Supply.
Completion Year: 2020
End User: Pak Arab Refinery
Description: Fabrication, Erection, Commissioning of Piping.
Project Location: Muzaffargarh Punjab PARCO Oil Refinery
Nature of Work: Mech Construction.
Completion Year: 2001
End User: Liberty Tenaga Berhad Malaysia
Description: 1) Assembly, Field joints Fabrication, Erection, and Testing of: Equipment, skids Piperack and Piping. 2) Pipeline Fabrication, Erection / Laying, Testing and Commissioning of: 12", Material Carbon Steel, 700mx4 length. Gas metering station, H2S removal (Amin and Sulfa treat), Dehydration Unit Erection, Condensate Handling, Fire Fighting Systems.
Project Location: Qadirpur Sindh Liberty Gas Treatment Plant
Nature of Work: Mech Installation and Construction.
Completion Year: 2001
End User: OMV
Description: Pipeline Fabrication, Erection / Laying, Testing and Commissioning.: 10", 8" size, Material Duplex Steel, 30 Kilometers length.
Project Location: Kadanwari Sindh Kadanwari Gas Field
Nature of Work: Mech Construction.
Completion Year: 2003
End User: OMV
Description: Pipeline Fabrication, Erection / Laying, Testing and Commissioning of: 20" size, Material Carbon Steel, 14 Kilometers length.
Project Location: Sawan Sind Sawan Gas Field
Nature of Work: Mech Construction.
Completion Year: 2003
End User: OMV
Description: Pipeline Fabrication, Erection / Laying, Testing and Commissioning of: 10" size, Material Carbon Steel, 21 Kilometers length.
Project Location: Kadanwari Sindh Kadanwari Gas Field
Nature of Work: Mech Construction.
Completion Year: 2005
End User: Petronas
Description: Erection / Installation of: Assorted Sizes and Schedule of Carbon Steel and Duplex Steel Flow Lines.
Project Location: Mehar Sindh Rehmat Gas Treatment Plant
Nature of Work: Mech Construction.
Completion Year: 2005
End User: Petronas
Description: Mechanical Overhauling Works during Annual Turn Around.
Project Location: Mehar Sindh Rehmat Gas Treatment Plant
Nature of Work: Mech Maintenance & Overhauling.
Completion Year: 2005
End User: MOL Pakistan Oil & Gas Co B.V.
Description: Fabrication and Supply of: 125 Ft height Flare Stack.
Project Location: Kohat KPK Gurguri Gas Treatment Plant
Nature of Work: Supply+Mech Fab.
Completion Year: 2008
End User: MOL
Description: Mechanical Construction Work for: Standby Dehydration Unit.
Project Location: Kohat KPK Gurguri Gas Treatment Plant
Nature of Work: Mech Construction.
Completion Year: 2009
End User: OMV Pakistan Exploration and Production
Description: Fabrication, Erection and Testing of piping works. of: Wartsila Engine upgraded Cooling System.
Project Location: Sawan Sind Sawan Gas Field
Nature of Work: Mech Fab.
Completion Year: 2009
End User: OMV Pakistan Exploration and Production
Description: Re Location of Incinerator and Installation of Flare Stack & Tip.
Project Location: Kadanwari Sindh Kadanwari Gas Field
Nature of Work: Mech Construction.
Completion Year: 2009
End User: MOL Pakistan Oil & Gas Co B.V.
Description: Mechanical Construction Works for: Wellhead Surface Facility.
Project Location: Kohat KPK Mamikhel-1 Wellhead Surface Facilities
Nature of Work: Mech Construction.
Completion Year: 2009
End User: OMV Pakistan Exploration and Production
Description: Laying of: Fire Water Ring at Kadanwari Camp-2.
Project Location: Kadanwari Sindh Kadanwari Gas Field
Nature of Work: Mech Construction.
Completion Year: 2010
End User: OMV Pakistan Exploration and Production
Description: Laying of: Fire Water Ring at Miano FEC Project.
Project Location: Miano Sindh Miano FEC Project.
Nature of Work: Mech Construction.
Completion Year: 2010
End User: OMV Pakistan Exploration and Production
Description: Fabrication and Supply of: Steel Structure For Level 3 & Level 4.
Project Location: Kadanwari Sindh Kadanwari Gas Field
Nature of Work: Supply
Completion Year: 2011
End User: OMV Pakistan Exploration and Production
Description: Fabrication and Erection of: Piping for Potable Water Line At Kadanwari Camp-2.
Project Location: Kadanwari Sindh Kadanwari Gas Field
Nature of Work: Mech Construction.
Completion Year: 2011
End User: OMV Pakistan Exploration and Production
Description: Installation of: Isolation & By-Pass Valves.
Project Location: Sawan Sind Sawan Gas Field
Nature of Work: Mech Construction.
Completion Year: 2011
End User: OMV Pakistan Exploration and Production
Description: Installation & Commissioning of: Corrosion Inhibitor Skid.
Project Location: Sawan Sind Sawan Gas Field
Nature of Work: Mech Construction.
Completion Year: 2011
End User: OMV Pakistan Exploration and Production
Description: Erection of: Piping at Miano 8.
Project Location: Miano Sindh Miano FEC Project.
Nature of Work: Mech Construction.
Completion Year: 2011
End User: OMV Pakistan Exploration and Production
Description: Piping Works for: Loading Arm.
Project Location: Sawan Sind Sawan Gas Field
Nature of Work: Mech Construction.
Completion Year: 2012
End User: OMV Pakistan Exploration and Production
Description: Supply & Installation of: Guy Mast Tower.
Project Location: Kadanwari Sindh Kadanwari Gas Field
Nature of Work: Mech Construction.
Completion Year: 2012
End User: OMV Pakistan Exploration and Production
Description: Mechanical Works during 2012 Annual Turn Around.
Project Location: Kadanwari Sindh Kadanwari Gas Field
Nature of Work: Mech Construction.
Completion Year: 2012
End User: OMV Pakistan Exploration and Production
Description: Field Development Works including Equipment Installation, Pipe Line, Piping, and Structure Works for: Gas Treatment Plants.
Project Location: Miano Sindh Miano FEC Project.
Nature of Work: Mech Construction.
Completion Year: 2013
End User: Pakistan Petroleum Ltd.
Description: Supply and Fabrication of: Flare Stack for Adhi - 3
Project Location: Adhi Sindh Adhi Gas Field
Nature of Work: Supply+Mech Fab.
Completion Year: 2014
End User: Polish Oil & Gas Company Pakistan
Description: Field Development Works including Equipment Installation, Pipe Line, Piping, and Structure.
Project Location: Daddu Sind Rehman Production Facility
Nature of Work: Mech Construction.
Completion Year: 2015
End User: OMV Pakistan Exploration and Production
Description: Installation of wellhead Compressors 03 Nos
Project Location: Kadanwari Sindh Kadanwari Gas Field
Nature of Work: Mech Construction.
Completion Year: 2015
End User: OMV Pakistan Exploration and Production
Description: Installation of wellhead Compressors 01 Nos
Project Location: Sawan Sind Sawan Gas Field
Nature of Work: Mech Construction.
Completion Year: 2015
End User: Quality One Petroleum Pvt Ltd.
Description: Construction of Oil Depot.
Project Location: Sahiwal Punjab Sahiwal Bonga Hayat Road Oil Depot
Nature of Work: Mech Construction.
Completion Year: 2016
End User: Outreach Pvt. Limited
Description: Supply of Oil Storage Tanks.
Project Location: Manga Punjab Manga Oil Depot.
Nature of Work: Mech Construction.
Completion Year: 2016
End User: Pak Arab Refinery
Description: Civil, Piping, Painting and Equipment Installation and E & I Works.
Project Location: Bobbat Sind Bobbat Oil Field
Nature of Work: CME Construction.
Completion Year: 2019
End User: Oil Industries Pakistan Pvt Ltd.(OIPL)
Description: Construction / Erection of Petroleum Storage Depot.
Project Location: Sahiwal Punjab
Nature of Work: CME Construction.
Completion Year: 2019
End User: Hi-Tech Lubricants Limited
Description: 1) Construction of: Tanks, Foundation & Gantry (Contract-II). 2) Supply & Installation of: Piping & Supports (Contract-IV). 3) Miscellaneous Civil Works (Contract-III).
Project Location: Nowshera KPK Nowshera Oil Depot
Nature of Work: Supply+CME Construction.
Completion Year: 2020
End User: Petroleum Exploration Pvt Ltd.PEPL
Description: Supply of: High Pressure Scrubber Material at Amine Plant.
Project Location: Jamshoro Sind Ayesha Gas Complex
Nature of Work: Supply.
Completion Year: 2020
End User: Hi-Tech Lubricants Limited
Description: Fabrication and Erection of Bulk storage tanks and associated piping for: SKO Tanks, PMG Tanks
Project Location: Sundar Punjab Oil Depot
Nature of Work: CME Construction.
Completion Year: 2021
End User: Hi-Tech Lubricants Limited
Description: Manufacturing & Supply of: U/G Storage Tanks of various sizes at HTL Retail Stations.
Project Location: Punjab & KPK regions
Nature of Work: Fabrication
Completion Year: 2022
End User: Hi-Tech Lubricants Limited
Description: Manufacturing & Supply of: U/G Storage Tanks of various sizes at HTL Retail Stations.
Project Location: Punjab & KPK regions
Nature of Work: Fabrication
Completion Year: 2023
End User: Hi-Tech Lubricants Limited
Description: Piping Materials to Remodel Decanting Headers, Materials for Foam Sprinkler System in Gantry at HTL Depot Nowshera
Project Location: HTL Nowshera, KPK Oil Depot
Nature of Work: Civil Construction.
Completion Year: 2023
End User: Hi-Tech Lubricants Limited
Description: Services for Repairing of PMG Tanks, Fall Arrestor System in Gantry at HTL Sahiwal Oil Depot
Project Location: HTL Sahiwal Oil Depot
Nature of Work: Civil Construction.
Completion Year: 2023
End User: MOL Pakistan
Description: WHSF DISMANTLING, CIVIL WORKS FOR WELL LOCATION CONSTRUCTION & WHSF RE-INSTALLATION FOR MAKORI EAST-5 SIDE-TRACK (CONTRACT REFERENCE NUMBER: CON1189)
Project Location: Makori East-5, KPK
Nature of Work: Civil Construction.
Completion Year: 2023
End User: MEINHARDT EPCM PAKISTAN (SHELL PAKISTAN)
Description: Civil Works for Construction of Sawan Filling Station NTI DHA Phase-2 Islamabad
Project Location: Sawan Filling Station NTI DHA Phase-2 Islamabad
Nature of Work: Civil Construction.
Completion Year: 2023
End User: MEINHARDT EPCM PAKISTAN (SHELL PAKISTAN)
Description: Supply, Transportation & Installation of Car Wash Lift and Equipments at Sawan Filling Station NTI DHA Phase 2 Islamabad
Project Location: Sawan Filling Station NTI DHA Phase-2 Islamabad
Nature of Work: Civil Construction.
Completion Year: 2023
End User: MEINHARDT EPCM PAKISTAN (SHELL PAKISTAN)
Description: Supply & Installation of Water Recycling Plant at Sawan Filling Station NTI DHA Phase-2 Islamabad
Project Location: Sawan Filling Station NTI DHA Phase-2 Islamabad
Nature of Work: Civil Construction.
Completion Year: 2023
End User: MEINHARDT EPCM PAKISTAN (SHELL PAKISTAN)
Description: Site Construction of SPL NTI-20 Ferozepur Road, Lahore
Project Location: Filling Station NTI 20 Ferozepur Road Lahore
Nature of Work: Civil Construction.
Completion Year: 2023
End User: MEINHARDT EPCM PAKISTAN (SHELL PAKISTAN)
Description: Supply & Installation of Water Recycling Plant at NTI 20 Ferozepur Road Lahore
Project Location: Filling Station NTI 20 Ferozepur Road Lahore
Nature of Work: Civil Construction.
Completion Year: 2023
End User: MEINHARDT EPCM PAKISTAN (SHELL PAKISTAN)
Description: Civil and Plumbing Works - KDR Project at IDEAL FILLING STATION-10041048 Sargodha
Project Location: Ideal Filling Station, Sargodha
Nature of Work: Civil Construction.
Completion Year: 2023
End User: MEINHARDT EPCM PAKISTAN (SHELL PAKISTAN)
Description: Civil & Plumbing Works for Site Construction at NTI Canal Pull Lahore
Project Location: Filling Station, NTI Canal Pull Lahore
Nature of Work: Civil Construction.
Completion Year: 2023
End User: Hi-Tech Lubricants Limited
Description: Construction of New Room at 2-K Lahore
Project Location: HTL Retail Station Construction at 2-K Gulberg, Lahore, Punjab
Nature of Work: Civil Construction.
Completion Year: 2024
End User: Hi-Tech Lubricants Limited
Description: Construction of Tank Pits & Fuel Down Fitting at 2-K Lahore
Project Location: HTL Retail Station Construction at 2-K Gulberg, Lahore, Punjab
Nature of Work: Civil Construction.
Completion Year: 2024
End User: Hi-Tech Lubricants Limited
Description: Construction of Steel Structure Canopy & Monopole 2-K Lahore
Project Location: HTL Retail Station Construction at 2-K Gulberg, Lahore, Punjab
Nature of Work: Civil Construction.
Completion Year: 2024
End User: Hi-Tech Lubricants Limited
Description: Construction Works: PRE-EXTENSION WORK HTL DEPOT AT NOWSHERA, KPK
Project Location: HTL Nowshera, KPK Oil Depot
Nature of Work: Civil Construction.
Completion Year: 2024
End User: Hi-Tech Lubricants Limited
Description: Civil Works (Buildings, Cut off Drain, Drive way) HTL Lahore Retail Station 2-K
Project Location: HTL Retail Station Construction at 2-K Gulberg, Lahore, Punjab
Nature of Work: Civil Construction.
Completion Year: 2024
End User: AFCCO OIL AND GAS FIELD SERVICES (SMC) PVT LTD.
Description: Construction of Drilling Yard Shed, Chemical Shed and Car Parking Shed
Project Location: Dadu, Sindh
Nature of Work: Civil Construction.
Completion Year: 2024
End User: AFCCO OIL AND GAS FIELD SERVICES (SMC) PVT LTD.
Description: Design, Supply and Installation of Structural Steel Works for Drilling Yard Shed, Chemical Shed and Car Parking Shed
Project Location: Dadu, Sindh
Nature of Work: Civil Construction.
Completion Year: 2024
End User: MOL Pakistan
Description: Decommissioning Cost Estimation for Processing and Compression Facilities
Project Location: KPK
Nature of Work: Civil Construction.
Completion Year: 2024
End User: Hi-Tech Blending Pvt Limited
Description: PIPING WORKS (PHASE - 1 PIPING FOR ADDITIVE TRANSFER)
Project Location: HTL Blending Plant Sundar Lahore, Punjab
Nature of Work: Civil Construction.
Completion Year: 2024
End User: MOL Pakistan
Description: Critical civil works for Makori East Secondary Compression project
Project Location: Kohat, KPK
Nature of Work: Civil Construction.
Completion Year: 2024
End User: MOL Pakistan
Description: Services required for Installation of Kirby Shed for Maramzai Compression
Project Location: KPK
Nature of Work: Civil & Mechanical Construction
Completion Year: Ongoing
End User: MOL Pakistan
Description: Construction Work for Razgir-01 WH and VA at Tolanj West-02
Project Location: Kohat, KPK
Nature of Work: Civil & Mechanical Construction
Completion Year: Ongoing
End User: MOL Pakistan
Description: Relocation of Condensate Storage Tank from Gurguri Plant
Project Location: Kohat, KPK
Nature of Work: Civil & Mechanical Construction
Completion Year: Ongoing
End User: Hi-Tech Blending Pvt Limited
Description: Phase - II Blending Kettles Piping Revamping For Additive Transfer
Project Location: HTL Blending Plant Sundar Lahore, Punjab
Nature of Work: Civil & Mechanical Construction
Completion Year: Ongoing
End User: Hi-Tech Blending Pvt Limited
Description: Phase - IV Modification Of Base Oil Decantation & Transfer Piping Works
Project Location: HTL Blending Plant Sundar Lahore, Punjab
Nature of Work: Civil & Mechanical Construction
Completion Year: Ongoing
End User: Hi-Tech Blending Pvt Limited
Description: Capacity Enhancement Of Additive Storage Tanks And Blending Kettles
Project Location: HTL Blending Plant Sundar Lahore, Punjab
Nature of Work: Civil & Mechanical Construction
Completion Year: Ongoing
End User: Hi-Tech Blending Pvt Limited
Description: Capacity Enhancement Of Additive Storage Tanks And Blending Kettles Piping Works
Project Location: HTL Blending Plant Sundar Lahore, Punjab
Nature of Work: Civil & Mechanical Construction
Completion Year: Ongoing
End User: Siddique Trade Center
Description: Installation of 03 Chillers and their associated piping and ducting.
Project Location: Lahore Siddique Trade Center
Nature of Work: Mech Construction.
Completion Year: 2004
End User: Hayat Hotels.
Description: Installation of: Bridge at Floor - 21 in Grand Hayat Hotel.
Project Location: Islamabad Grand Hayat Hotel
Nature of Work: Civil+Mechanical Construction
Completion Year: 2015
End User: Pakistan Navy
Description: Supply of: Ballast K500L Blocks 12 Nos.
Project Location: Karachi
Nature of Work: Supply.
Completion Year: 2022
End User: Descon Oxy Chem
Description: Fabrication and Erection of: Steel Structure for Various Buildings including Pipe Rack.
Project Location: Sheikhpura Punjab Descon Oxy Chem
Nature of Work: Mech Construction.
Completion Year: 2008
End User: ICI Pakistan.
Description: Installation of: Coal Fired Boiler in Khewra Plant.
Project Location: Khewra Punjab ICI Pakistan Soda Ash Plant
Nature of Work: Mech Construction.
Completion Year: 2013
End User: Best Way Cement Ltd.
Description: Installation of: Coal Fired Boilers (Qty 02).
Project Location: Kallar Kahar Punjab Best Way Cement Factory
Nature of Work: Mech Construction.
Completion Year: 2013
End User: Hi-Tech Blending Pvt Limited
Description: Construction of: Oil Depot
Project Location: Sahiwal Punjab
Nature of Work: Supply+CME Construction.
Completion Year: 2016
End User: ICI Pakistan
Description: Sandblasting & Painting of: Steel Structure.
Project Location: Khewra Punjab ICI Pakistan Soda Ash Plant
Nature of Work: Mech Construction.
Completion Year: 2017
End User: Hi-Tech Lubricants Limited
Description: Construction of: Oil Depot at Arifwala Road Sahiwal.
Project Location: Sahiwal Punjab Arifwala Road Sahiwal, Oil Depot
Nature of Work: CME Construction.
Completion Year: 2019
End User: FLOW Petroleum
Description: Construction of: Oil Bulk Depot at Attock.
Project Location: Attock KPK Attock Oil Depot
Nature of Work: CME Construction.
Completion Year: 2019
End User: Spring Supports Fabrication
Description:
Project Location:
Nature of Work: Fabrication.
Completion Year: 2020
End User:
Description: Supply of Galvanized Rungs
Project Location:
Nature of Work: Supply.
Completion Year: 2020
End User: Oil & Gas Development Corporation Limited
Description: Supply of Stair Treads and Grating.
Project Location: KPK NASHPA
Nature of Work: Supply.
Completion Year: 2020
End User: Alternative Chemicals Pvt Limited
Description: Construction of: Tank Foundation.
Project Location: Sundar Punjab
Nature of Work: Civil Construction.
Completion Year: 2021
End User: Nimir Chemicals Pvt Limited
Description: Fabrication and erection of: Orth xylene Storage Tank.
Project Location: Sheikhupura Punjab Nimir Chemical Complex
Nature of Work: Mech Construction.
Completion Year: 2021
End User: Naveena steel Mills
Description: Supply of: Cable Trays.
Project Location: Karachi Sind Naveena steel Mills
Nature of Work: Supply.
Completion Year: 2021
End User: Hi-Tech Blending Pvt Limited
Description: Construction Works: Utility Building for New EBM Section at HTBL Plant
Project Location: HTL Blending Plant Sundar Lahore, Punjab
Nature of Work: CME Construction.
Completion Year: 2022
End User: Hi-Tech Blending Pvt Limited
Description: Construction Works: Extension of Warehouse-2 Building.
Project Location: HTL Blending Plant Sundar Lahore, Punjab
Nature of Work: CME Construction.
Completion Year: 2022
End User: Hi-Tech Blending Pvt Limited
Description: (Additional Construction Works of Warehouse Extension) Construction of Rainwater Reservoir Well
Project Location: HTL Blending Plant Sundar Lahore, Punjab
Nature of Work: Civil Construction.
Completion Year: 2022
End User: Hi-Tech Blending Pvt Limited
Description: Construction of Wall Partition for EBM Section-2 at HTBL Blending Plant
Project Location: HTL Blending Plant Sundar Lahore, Punjab
Nature of Work: Civil Construction.
Completion Year: 2022
End User: Hi-Tech Blending Pvt Limited
Description: Construction of Wall Partition for Filling Hall Workshop & Store Room at HTBL Blending Plant
Project Location: HTL Blending Plant Sundar Lahore, Punjab
Nature of Work: Civil Construction.
Completion Year: 2022
End User: Hi-Tech Blending Pvt Limited
Description: Supply & Installation of Pipeline Fittings & Support of Air Vessel 5000L and HSD Tank 10000 L
Project Location: HTL Blending Plant Sundar Lahore, Punjab
Nature of Work: Civil Construction.
Completion Year: 2022
End User: Hi-Tech Blending Pvt Limited
Description: Supply & Installation of Air Vessel 5000 Litres & Light Poles
Project Location: HTL Blending Plant Sundar Lahore, Punjab
Nature of Work: Civil Construction.
Completion Year: 2022
End User: Hi-Tech Blending Pvt Limited
Description: Existing Warehouse # 1 Building - Additional Work
Project Location: HTL Blending Plant Sundar Lahore, Punjab
Nature of Work: Civil Construction.
Completion Year: 2022
End User: Hi-Tech Blending Pvt Limited
Description: Supply & Installation of Air Vessel 5000 Litres - EBM Department
Project Location: HTL Blending Plant Sundar Lahore, Punjab
Nature of Work: Civil Construction.
Completion Year: 2022
End User: Hi-Tech Blending Pvt Limited
Description: Civil, Mechanical, Sandblasting & Painting Works of EOT Crane 10 Ton capacity
Project Location: HTL Blending Plant Sundar Lahore, Punjab
Nature of Work: Civil Construction. Mech Works
Completion Year: 2022
End User: Hi-Tech Blending Pvt Limited
Description: (Additional Construction Works of Warehouse Extension) Construction of Laboratory, Crusher Room, Office Rooms & Worker Change Rooms at HTBL Plant
Project Location: HTL Blending Plant Sundar Lahore, Punjab
Nature of Work: Civil Construction.
Completion Year: 2022
End User: Hi-Tech Blending Pvt Limited
Description: Construction of Wall Partition for Custom Bounded Warehouse at HTBL Blending Plant
Project Location: HTL Blending Plant Sundar Lahore, Punjab
Nature of Work: Civil Construction.
Completion Year: 2023
End User: Hi-Tech Blending Pvt Limited
Description: Construction of Wall Partition for EBM-II Workshop at HTBL Blending Plant
Project Location: HTL Blending Plant Sundar Lahore, Punjab
Nature of Work: Civil Construction.
Completion Year: 2023
End User: Hi-Tech Blending Pvt Limited
Description: Construction of Road & Filling Remaining Pond Area (Location-Mosque to Farmhouse Front Side Road & Pond Area) at HTBL Sundar Blending Plant
Project Location: HTL Blending Plant Sundar Lahore, Punjab
Nature of Work: Civil Construction.
Completion Year: 2023
End User: Hi-Tech Blending Pvt Limited
Description: (Additional Construction Works of Warehouse Extension) Construction of HTBL Boundary Wall, Road & Drain and additional wall Part-5
Project Location: HTL Blending Plant Sundar Lahore, Punjab
Nature of Work: Civil Construction.
Completion Year: 2023
End User: Hi-Tech Blending Pvt Limited
Description: Supply & Installation Services of Compressor Room Piping at HTL Blending Plant Sundar Lahore
Project Location: HTL Blending Plant Sundar Lahore, Punjab
Nature of Work: Civil Construction.
Completion Year: 2023
End User: Hi-Tech Blending Pvt Limited
Description: Construction of Staff Office & Meeting Room at EBM-II Electrical Work
Project Location: HTL Blending Plant Sundar Lahore, Punjab
Nature of Work: Civil Construction.
Completion Year: 2024
End User: Hi-Tech Blending Pvt Limited
Description: Construction of Staff Office at EBM-II at HTL Blending Plant Sundar Lahore
Project Location: HTL Blending Plant Sundar Lahore, Punjab
Nature of Work: Civil Construction.
Completion Year: 2024
End User: Hi-Tech Blending Pvt Limited
Description: Modification Works for Compressor Room in EBM Unit-1 at HTL Blending Plant Sundar Lahore
Project Location: HTL Blending Plant Sundar Lahore, Punjab
Nature of Work: Civil Construction.
Completion Year: Ongoing
End User: Engro Corporation
Description: Construction Works of Feed Through, Water Through, Cow Calf Shades, Cow Shades.
Project Location: Chundki Sind EFL Nara Plant Capacity 400 GPM
Nature of Work: Civil Construction.
Completion Year: 2009
End User: Engro Corporation
Description: Absorption Chiller Room.
Project Location: Chundki Sind EFL Nara Plant Capacity 400 GPM
Nature of Work: Civil Construction.
Completion Year: 2009
End User: Engro Corporation
Description: Mechanical Construction of: Sprinkler System
Project Location: Chundki Sind EFL Nara Plant Capacity 400 GPM
Nature of Work: Mech Construction.
Completion Year: 2010
End User: Engro Corporation
Description: Design & Construction Works for: Primary Waste Water Treatment Project.
Project Location: Chundki Sind EFL Nara Plant Capacity 400 GPM
Nature of Work: EPCC.
Completion Year: 2010
End User: OMV Pakistan Exploration and Production
Description: Drainage Works for: New Tetra pack Hall using Stainless Steel Pipes.
Project Location: Sahiwal Punjab
Nature of Work: Mech Construction.
Completion Year: 2012
End User: Government of Punjab.
Description: 1) Piping Works ( Hot, Steam & Air). 2) Supply, Fabrication & Installation of Steel Structure for Animal Waiting Saloon. 3) Fabrication, erection and Testing of Fuel Storage Tanks and Water Reservoir Tanks.
Project Location: Lahore, Punjab Municipality Slaughter House
Nature of Work: Mech Construction.
Completion Year: 2012
End User: Haut Buys
Description: Construction of: Milking Parlour.
Project Location: Qasoor Punjab Haut Buys Foods
Nature of Work: Civil Construction.
Completion Year: 2022
End User: Hewadawal
Description: Design, Supply and Installation of: Jet Fuel Oil Storage Tanks.
Project Location: Afghanistan Kabul Air Port Fuel Storage Facility
Nature of Work: Design+Mech Fab
Completion Year: 2009
End User: US Army
Description: Design, Supply and Installation of: Waste Water Treatment Plant.
Project Location: Afghanistan Kabul Air Port Fuel Storage Facility
Nature of Work: EPCC.
Completion Year: 2009
End User: OMV Pakistan Exploration and Production
Description: Supply and Installation of: Coal Fired Boiler and Oil Heater.
Project Location: Faisalabad Punjab Bismallah Textiles Ltd
Nature of Work: Supply+Mech Construction.
Completion Year: 2012
End User: Warid & Wincom
Description: Mechanical Fabrication & Erection of: Mobile Phone Towers.
Project Location: Multiple Locations Various Regions Nationwide
Nature of Work: Supply+Mech Fab.
Completion Year: 2009
End User: JAZZ Pakistan
Description: Supply and CME Works & SAQ Works for: B2S Tower.
Project Location: Multiple Locations Various Regions Nationwide
Nature of Work: Supply+CME Construction.
Completion Year: 2017
End User: MEP Solution Pvt Limited
Description: Supply of Handholes Type 1 (900mm x 900mm x 900mm)
Project Location: Lahore
Nature of Work: Supply.
Completion Year: 2018
End User: JAZZ Pakistan
Description: Supply and CME Works & SAQ Works for: B2S Tower.
Project Location: Multiple Locations Various Regions Nationwide
Nature of Work: Supply+CME Construction.
Completion Year: 2018
End User: Telenor, Mobilink, Zong & Ufone
Description: Manufacturing, Supply, CME Works & SAQ Works for: B2S Telecom Towers and Sites Buildouts
Project Location: Multiple Locations Various Regions Nationwide
Nature of Work: Supply+CME Construction.
Completion Year: 2018
End User: Telenor, Mobilink, Zong & Ufone
Description: Manufacturing, Supply, CME Works & SAQ Works for: B2S Telecom Towers and Sites Buildouts
Project Location: Multiple Locations Various Regions Nationwide
Nature of Work: Supply+CME Construction.
Completion Year: 2019
End User: JAZZ Pakistan
Description: Supply and CME Works & SAQ Works for: B2S Tower.
Project Location: Multiple Locations Various Regions Nationwide
Nature of Work: Supply+CME Construction.
Completion Year: 2019
End User: Telenor, Mobilink, Zong & Ufone
Description: Manufacturing, Supply, CME Works & SAQ Works for: B2S Telecom Towers and Sites Buildouts
Project Location: Multiple Locations Various Regions Nationwide
Nature of Work: Supply+CME Construction.
Completion Year: 2019
End User: Telenor, Mobilink, Zong & Ufone
Description: Manufacturing, Supply, CME Works & SAQ Works for: B2S Telecom Towers and Sites Buildouts
Project Location: Multiple Locations Various Regions Nationwide
Nature of Work: Supply+CME Construction.
Completion Year: 2020
End User: JAZZ Pakistan
Description: Supply and CME Works & SAQ Works for: B2S Tower.
Project Location: Multiple Locations Various Regions Nationwide
Nature of Work: Supply+CME Construction.
Completion Year: 2020
End User: Telenor, Mobilink, Zong & Ufone
Description: Manufacturing, Supply, CME Works & SAQ Works for: B2S Telecom Towers and Sites Buildouts
Project Location: Multiple Locations Various Regions Nationwide
Nature of Work: Supply+CME Construction.
Completion Year: 2020
End User: Telenor, Mobilink, Zong & Ufone
Description: Manufacturing, Supply, CME Works & SAQ Works for: B2S Telecom Towers and Sites Buildouts
Project Location: Multiple Locations Various Regions Nationwide
Nature of Work: Supply+CME Construction.
Completion Year: 2021
End User: JAZZ Pakistan
Description: Supply and CME Works & SAQ Works for: B2S Tower.
Project Location: Multiple Locations Various Regions Nationwide
Nature of Work: Supply+CME Construction.
Completion Year: 2021
End User: Telenor, Mobilink, Zong & Ufone
Description: Manufacturing, Supply, CME Works & SAQ Works for: B2S Telecom Towers and Sites Buildouts
Project Location: Multiple Locations Various Regions Nationwide
Nature of Work: Supply+CME Construction.
Completion Year: 2021
End User: STC and Zain
Description: Monopole Supply for Bahrain Project
Project Location: Multiple Locations Various Regions Nationwide
Nature of Work: Supply.
Completion Year: 2022
End User: SEC
Description: Supply of: Tubular Pole 07 Meter.
Project Location: Gilgit and Azad Kashmir
Nature of Work: Supply.
Completion Year: 2022
End User: Telenor, Mobilink, Zong & Ufone
Description: Manufacturing, Supply, CME Works & SAQ Works for: B2S Telecom Towers and Sites Buildouts
Project Location: Multiple Locations Various Regions Nationwide
Nature of Work: Supply+CME Construction.
Completion Year: 2022
End User: JAZZ Pakistan
Description: Supply and CME Works & SAQ Works for: B2S Tower.
Project Location: Multiple Locations Various Regions Nationwide
Nature of Work: Supply+CME Construction.
Completion Year: 2022
End User: Telenor, Mobilink, Zong & Ufone
Description: Manufacturing, Supply, CME Works & SAQ Works for: B2S Telecom Towers and Sites Buildouts
Project Location: Multiple Locations Various Regions Nationwide
Nature of Work: Supply+CME Construction.
Completion Year: 2022
End User: Telenor, Mobilink, Zong & Ufone
Description: Manufacturing, Supply, CME Works & SAQ Works for: B2S Telecom Towers and Sites Buildouts
Project Location: Multiple Locations Various Regions Nationwide
Nature of Work: Supply+CME Construction.
Completion Year: 2023
End User: JAZZ Pakistan
Description: Supply and CME Works & SAQ Works for: B2S Tower.
Project Location: Multiple Locations Various Regions Nationwide
Nature of Work: Supply+CME Construction.
Completion Year: 2023
End User: Telenor, Mobilink, Zong & Ufone
Description: Manufacturing, Supply, CME Works & SAQ Works for: B2S Telecom Towers and Sites Buildouts
Project Location: Multiple Locations Various Regions Nationwide
Nature of Work: Supply+CME Construction.
Completion Year: 2023
End User: Telenor, Mobilink, Zong & Ufone
Description: Manufacturing, Supply, & CME Works for: B2S Telecom Towers and Sites Buildouts
Project Location: Multiple Locations Various Regions Nationwide
Nature of Work: Supply+CME Construction.
Completion Year: 2023
End User: Telenor, Mobilink, Zong & Ufone
Description: Manufacturing & Supply of Telecom Towers, accessories and Buildouts.
Project Location: Multiple Locations Various Regions Nationwide
Nature of Work: Supply.
Completion Year: 2023
End User: Telenor, Mobilink, Zong & Ufone
Description: Manufacturing & Supply of Telecom Towers, accessories and Buildouts.
Project Location: Multiple Locations Various Regions Nationwide
Nature of Work: Supply.
Completion Year: Ongoing
End User: Telenor, Mobilink, Zong & Ufone
Description: Engineering Services (Civil Works & Telecom Equipment related Scope)
Project Location: Multiple Locations Various Regions Nationwide
Nature of Work: Civil Works & Telecom Equipment
Completion Year: Ongoing
End User: JAZZ Pakistan
Description: Supply and CME Works & SAQ Works for: B2S Tower.
Project Location: Multiple Locations Various Regions Nationwide
Nature of Work: Supply+CME Construction.
Completion Year: Ongoing
End User: Telenor, Mobilink, Zong & Ufone
Description: Manufacturing, Supply, CME Works & SAQ Works for: B2S Telecom Towers and Sites Buildouts
Project Location: Multiple Locations Various Regions Nationwide
Nature of Work: Supply+CME Construction.
Completion Year: Ongoing
End User: Telenor, Mobilink, Zong & Ufone
Description: Manufacturing, Supply, CME Works & SAQ Works for: B2S Telecom Towers and Sites Buildouts
Project Location: Multiple Locations Various Regions Nationwide
Nature of Work: Supply+CME Construction.
Completion Year: Ongoing
End User: Telenor, Mobilink, Zong & Ufone
Description: Manufacturing, Supply, & CME Works for: B2S Telecom Towers and Sites Buildouts
Project Location: Multiple Locations Various Regions Nationwide
Nature of Work: Supply+CME Construction.
Completion Year: Ongoing
End User: Best Way Cement Ltd.
Description: Installation of: Coal Fired Boilers (Qty 02).
Project Location: Kallar Kahar Punjab Best Way Cement Factory
Nature of Work: Mech Construction.
Completion Year: 2013
End User: Airmed
Description: Supply & Installation of: PEB Shed at Plot 284.
Project Location: Bhalwal Punjab
Nature of Work: Supply+CME Construction.
Completion Year: 2021
End User: Miltech
Description: Supply & Installation of: Counterpoise Cable.
Project Location: Islamabad IBD Air Base Airport
Nature of Work: Supply+E Construction.
Completion Year: 2021
End User: Airmed
Description: Construction Works at: Plot 284, Bhalwal Industrial Estate.
Project Location: Bhalwal Punjab
Nature of Work: Civil Construction.
Completion Year: 2022